The fire broke out on October 27 during the installation of a deep tube well in Inani’s Chhoto Bridge area in Ukhiya.
The fire broke out on October 27 during the installation of a deep tube well in Inani’s Chhoto Bridge area in Ukhiya.Waadaa

Inani gas fire extinguished after a month, Bapex to drill deeper

A 30-inch casing helped stop the blaze, but the site's commercial gas potential remains unconfirmed
Updated on: 

Bangladesh Petroleum Exploration and Production Company Limited (Bapex) on Friday brought a month-long gas fire under control in Inani, Cox’s Bazar, paving the way for further exploration at the site.

Engineers installed a 30-inch casing on November 27 and redirected the escaping gas through a specially designed diversion line, extinguishing flames at multiple points around the well.

Bapex is now preparing to drill another 1,000 feet. Specially formulated drilling mud will be used to balance underground pressure and prevent uncontrolled gas emissions during the operation.

The company will subsequently conduct geological and seismic surveys to assess the site's gas potential. The findings will determine the scope of further exploration.

The fire broke out on October 27 during the installation of a deep tube well in Inani’s Chhoto Bridge area in Ukhiya.

Gas suddenly erupted from underground and ignited after coming into contact with electrical wires. Flames spread as gas escaped through multiple points around the well. Bapex experts made several technical interventions over the following month before successfully redirecting the gas flow on Friday.

While extinguishing the fire marks a technical breakthrough, it does not establish the presence of commercially viable gas reserves.

That will depend on what Bapex finds beneath the surface through further drilling and geological assessments.